A hardscape contractor lifting a concrete wall block onto her own trailer in her yard at dusk.

Construction Overhead Worksheet and Payment Calculator for Columbus, NE Contractors

Construction overhead is what it costs to keep a contracting business open that no single job pays for directly: rent, insurance, office wages, truck payments, software and shop repairs. This page works an overhead rate out by hand for an invented Columbus, NE contractor.

The calculator on this page then finds the level monthly payment on an amount, a rate and a term. Questions go to (531) 204-3873.

Fill in an offer's numbers, or test numbers you are planning. Nothing you type is sent anywhere.

Cost Figures in Summary

Estimated monthly payment
—
Total interest
—
Total repaid
—

Illustrative arithmetic only. Not an offer, quote or estimate of terms available to you. Lending partners set actual rates and terms. Fees and other costs are not included.

In short

Overhead is worked out by hand here: add the monthly costs no job pays for, then divide the year's total by expected direct job costs. The calculator on this page computes level loan payments only. Four invented examples use both.

Worked Example: Construction Overhead for a Contractor Planning Crew Payroll

Start with the costs that run whether or not a crew is on a site. In this invented worksheet they come to $19,000 a month, or $228,000 a year. Divided by $1,520,000 of expected direct job costs for the year (crew wages, material and subcontractors), the overhead rate is 15.0%.

Illustration only, invented figures: monthly overhead for one contractor
Overhead lineMonthly amount
Office and yard rent$3,200
Insurance premiums$2,450
Office staff wages$6,800
Truck and equipment payments$4,100
Phones, software and accounting$950
Shop equipment repairs$1,500

A job with $84,000 of direct costs, $36,000 of it crew wages, then carries $12,600 of overhead on top. If the first progress payment arrives after several paydays, a working capital loan can bridge the crew payroll. The table works that payment out the way the calculator on this page does.

Illustration only, invented figures: payment on a crew payroll gap
ItemFigure
Amount ($)$24,500
Rate (annual %)13
Term (months)6
Estimated monthly payment$4,239.55
Total interest$937.30
Total repaid$25,437.30

County Business Patterns counted 15 electrical contractor establishments (NAICS 238210) with paid staff in Platte County, NE in 2023, reporting 179 employees between them for the March pay period.

Worked Example: Construction Overhead for a Contractor Planning Cash Between Draws

On a bid with $310,000 of direct costs, the same overhead share of 15.0% adds $46,500 of overhead before any profit. Where a job calls for a bid or performance bond, the surety sets its own terms; Limepeak Finance does not arrange bonds, and this worksheet leaves them out.

A contractor may want a cash cushion to carry crews and materials until the draws on a large job come in. This invented case prices a cushion as a level-payment working capital loan.

Illustration only, invented figures: payment on a cash cushion carried between draws
ItemFigure
Amount ($)$38,700
Rate (annual %)11.5
Term (months)24
Estimated monthly payment$1,812.72
Total interest$4,805.28
Total repaid$43,505.28

Worked Example: Construction Overhead for a Contractor Planning Equipment Repairs

Repairs to shop equipment count as overhead because no single job pays for them. If the repair line in the worksheet climbs from $1,500 to $3,000 a month for a year, annual overhead rises to $246,000 and the rate to 16.2% of the same direct costs. Bids priced at the old rate would then fall short on every job.

A large single repair, such as rebuilding a skid steer's engine, can instead be funded and paid off over a year, which keeps the monthly overhead line steady.

Illustration only, invented figures: payment on a skid-steer engine rebuild
ItemFigure
Amount ($)$9,900
Rate (annual %)12.5
Term (months)12
Estimated monthly payment$881.92
Total interest$683.04
Total repaid$10,583.04

Worked Example: Construction Overhead for a Contractor Planning Materials

Material is a direct cost, so it sits inside the base the overhead rate is applied to: $27,500 of lumber, wire and conduit for a big bid carries $4,125 of overhead at 15.0%.

Paying the supplier before the first draw can be done on a level-payment loan, priced in the table, or on a line of credit drawn and paid down as progress payments come in. The calculator on this page handles only the level-payment case; draws and paydowns are worked by hand on the line of credit page. With the figures in hand, the online request form opens a request using ranges alone, and the material cost and draw dates come up on the call.

Illustration only, invented figures: payment on a material order for a large bid
ItemFigure
Amount ($)$27,500
Rate (annual %)12
Term (months)6
Estimated monthly payment$4,745.08
Total interest$970.48
Total repaid$28,470.48

By Limepeak Finance · Updated

Deeper Reading on Overhead Worksheet Throughout Columbus, NE

  • Worksheets and checklists

    Tools and checklists for Columbus, NE owners: a construction overhead worksheet, a payment calculator and starting lists for shops, stores and contractors.

Overhead and Calculator Questions for Columbus, NE Contractors

What does the calculator on this page work out?

Only level-payment arithmetic. Enter how much you would fund, the rate per year and how many months, and it returns the monthly payment, the interest that term adds and what all the payments come to together. Overhead, draws and interest-only stretches are not in it; the worksheet on this page works overhead out by hand. Nothing typed into it is sent anywhere.

Should overhead include the owner's pay?

It depends on the owner's role. When the owner runs the office and estimates rather than working on a crew, the salary can sit in overhead; when the owner swings a hammer on the job, it can go into direct labor. Pick one and keep it consistent, so the rate does not count the same wages twice. A tax preparer or accountant can say how it should be booked.

Material and Crew Costs Due Before the First Draw?

Call (531) 204-3873 with the material cost, the crew payroll and when the first progress payment is due.

Dial (531) 204-3873 to talk it overStart